New steel standpipe (above right), will replace the exisitng concrete standpipe, left.
(December 11, 2018)
|
7 rings to go
(January 8, 2019)
|
Location:
|
Delaware
|
Owner:
|
Municipality of Middlesex Centre
|
Contract Type:
|
General Contractor
|
Engineer:
|
Stantec Consulting Ltd.
|
Value:
|
$2,010,000
|
Started:
|
September 2018
|
Completed:
|
May 2019
|
Description:
|
Construction of a new standpipe, having an initial design capacity of approximately 2,067 m3, for the storage and distribution of water.
|
|