Hayman Cosntruction - Home
 

HIGHRISE PROJECTS

 Seasons Retirement

(St. Catharines)

 

Seasons Retirement
(London)

 

Glendale Crossing (London)

 

Sifton West 5 Retirement Living Phase 1
(London)

 

Essroc Concrete Silo (Toronto)

 

One London Place (London)

 

Waterloo Residential
High Rise 
(Waterloo)

 

Station Park Hotel (London)

 

Woodstock Peace Lighthouse (Woodstock)

 

Windsor Justice Facility (Windsor)

 

Victoria Hospital (London)

 

 

 
 
 

Windsor Justice Facility

Reinforced Concrete Package

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Concrete formwork by our forces (top left and right),
with the finished project (by others) at the bottom left.

Location:

Windsor

Owner:

Ontario Realty Corporation

Contract Type:

Subcontract to  BFC Buildings of Scarborough

Architect:

A Joint Venture of :

   • DuBois Plumb Partnership Inc.,
       (Toronto)

   • Carruthers Shaw and Partners Ltd.
       (Toronto)

Value:

$2,000,000

No. of Storeys:

9

Area:

79,000 sf / 7,300 sm

Concrete: 

5,023 cy / 3,840 cm

Started:

Fall 1997

Completed:

Spring 1999

Description:

Our forces building this 9 floor reinforced concrete structure.

 

Google Street View

 

 

 

 

 

 
 
© Copyright 2024 Hayman Construction Inc. All Rights Reserved.
Web Design and Content Management by REM Web Solutions.

HOME PORTFOLIO PLANS ROOM REFERENCES  
ABOUT PROJECT LOCATIONS AFFILIATIONS CONTACT  


CLICK HERE TO LOGIN TO OUR DIGITAL PLANS ROOM
Hayman Construction Inc.
636 Wellington Street
London ON N6A 3R9

Tel: (519) 433-3966
Fax: (519) 433-8351

Estimating Department: [email protected]

General Inquiries: [email protected]

Accounting: [email protected]