Hayman Cosntruction - Home
 

BRIDGES

Thames Valley Parkway
(London)

Port Bruce (Port Bruce)

Hyde Park Road (London)

Gore Road (London)

Oxford St. (London)

Kilworth (Kilworth)

 

 

 

 
 
 

Pike Road Bridge Replacement (Strathroy)

July 2025 - Abutment Construction for New Bridge beside existing bridge

July 2025 - Forming Up Abutment for New Bridge

Location:

Strathroy

Owner:

The Corporation of Middlesex County

Contract Type:

General Contractor

Engineer:

BT Engineering

Value:

$5,800,000

Started:

May 2025

Completon:

November 2025

Description:

Replacement of existing 2 lane vehicular bridge over creek

 

Google Maps

Google Street Views

Google  3D View

September 12, 2025 - Drone Flyover

 

May 2025 - Existing Bridge to be Replaced

 

May 2025 - Existing Bridge to be Replaced

 

 
 
© Copyright 2026 Hayman Construction Inc. All Rights Reserved.
Web Design and Content Management by REM Web Solutions.

HOME PORTFOLIO PLANS ROOM REFERENCES  
ABOUT PROJECT LOCATIONS AFFILIATIONS CONTACT  


CLICK HERE TO LOGIN TO OUR DIGITAL PLANS ROOM
Hayman Construction Inc.
636 Wellington Street
London ON N6A 3R9

Tel: (519) 433-3966
Fax: (519) 433-8351

Estimating Department: [email protected]

General Inquiries: [email protected]

Accounting: [email protected]