July 2024 - New construction underway
July 2024 - Piling Installation
|
Location:
|
St. Thomas
|
Owner:
|
City of St. Thomas
|
Contract Type:
|
General Contractor
|
Engineer:
|
Arcadis
|
Value:
|
$14,300,000
|
Started:
|
June 2024
|
Completion:
|
July 2025
|
Description:
|
Water Booster Pumping Station, located next to the existing Elgin Middlesex Pumping Station (built by us in 1994).
Underground level will Include four 300 kW (400 hp) pumps and associated piping, valves, electrical, HVAC and SCADA controls.
|
|