Concrete formwork by our forces (top left and right),
with the finished project (by others) at the bottom left.
|
Location:
|
London
|
Owner:
|
Victoria Hospital Corporation
(now London Health Sciences Centre)
|
Contract Type:
|
Subcontract to EllisDon
|
Architect:
|
Paul Skinner, London
|
Value:
|
$3,319,000
|
No. of Storeys:
|
7 (2 towers)
|
Area:
|
Footprint 43,050 sf / 4,000 sm
Gross 301,300 sf / 28,000 sm
|
Concrete:
|
25,113 cy / 19,200 cm
|
Started:
|
January 1983
|
Completed:
|
November 1983
|
Description:
|
Our forces built 2 7-storey reinforced concrete towers.
|
|
Google Street View
|
|
|
|
|